Skip to content
Raise Lens
Enova (Norway)

Varmesentraler Grant

Funding route · apply any time

Amount
NOK 10.6M
Deadline
Rolling: no fixed deadline
Who can apply
SMEs, large companies, non-profits and 2 more · Norway

Free accounts: 1 official link a month · Pro: every link

In context

This call is open to small and medium-sized businesses, large companies and non-profits and 2 others. Funding is a grant. Coverage is read from the notice itself: Norway.

Summary

Enova offers fixed per-kilowatt support to businesses, buildings, sports facilities and industrial users that install renewable heat central systems such as biomass boilers, heat pumps or district heating connections to replace fossil or direct electric heating. The programme aims to cut fossil fuel use, ease strain on Norway's electricity grid and lower heating costs.

Summary by Raise Lens from the official notice · 11 Nov 2026Accurate?

About this grant

Heat Centrals is a Norwegian grant programme that backs the installation of renewable heat central systems, aimed at cutting electricity use for heating and easing strain on the power grid during cold spells. It is open to companies considering a renewable heating investment, including small and large firms, nonprofits, local authorities and engineering contractors. Support is paid as a fixed amount per installed kilowatt, with the rate set by the chosen technology. Eligible options include biomass boilers, several kinds of heat pump and customer substations connected to district heating. Higher rates apply where a project adds a thermal accumulator, an electrostatic filter on a biomass boiler, natural refrigerants in a heat pump, or a switch to water-based heating. Applications are assessed individually on a rolling basis, and incomplete submissions may be rejected.

Full description from the source

Enova's Varmesentraler programme supports businesses that want to invest in a central heating plant (varmesentral) running on renewable energy sources for space and process heating. The programme addresses Norway's heavy reliance on electricity for heating, which accounts for close to 50 TWh per year and creates strain on the power grid on cold days. Switching to renewable central heating reduces direct electricity use, can lower power bills for the owner, and can reduce the need for costly grid reinforcement. The solution is aimed particularly at buildings, sports facilities and industry. Supported technologies include biomass boilers (biokjel), various heat pumps, and customer substations connected to district heating (kundesentral tilkoblet fjernvarme). Projects may receive higher support when they include additional options such as a thermal accumulator (akkumulator), an electrostatic filter in biomass boilers, natural working fluids in heat pumps, near-heating arrangements (nærvarme), or conversion to water-based heating (vannbåren varme). Support is calculated as a fixed rate per installed capacity in kroner per kW, with the rate depending on the technology. The maximum support applies up to 3 MW of capacity and cannot exceed NOK 10 million. The programme is open continuously with no fixed deadlines, and applications are assessed individually as they arrive. Enova notes that terms may be adjusted one to two times per year and that the offer runs until summer 2027.

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

Eligibility

Companies (foretak) considering investing in a renewable heating solution are eligible. The applicant must be registered in the Norwegian company register (foretaksregisteret) and must meet the general requirements for state aid. The programme targets buildings, sports facilities and industrial purposes. No prior-recipient rules are stated on the page.

How it's scored

Applications are processed on a rolling basis and assessed individually. Processing time varies with case complexity and capacity. Incomplete applications may be rejected. Support amounts are determined by technology-specific rates per kW, with uplifts for selected add-on options; the page does not describe a scoring or weighting system.

Key requirements

  • Investment must be in a renewable heat central system replacing fossil oil, fossil gas or direct electric heating
  • Support is calculated as a fixed rate per installed kW depending on the chosen technology
  • Higher rates available for add-ons such as accumulators, natural refrigerants or conversion to water-based heating

Funder contact

The notice names a programme contact you can speak to before applying.

Frequently asked questions

How much funding does Enova offer?
Varmesentraler offers NOK 10.6M.
When is the Varmesentraler deadline?
This is a rolling call with no fixed deadline, so applications are accepted on an ongoing basis.
Who can apply for Varmesentraler?
Eligibility covers SMEs, large companies, non-profits, local authorities and engineering contractors in Norway. See the eligibility criteria above for the full conditions.

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceEnova (Norway)
EligibilityNorway
Org typesSMEs, large companies, non-profits, local authorities, engineering contractors
Last verified11 Nov 2026

Documents to prepare

We found no document list in this listing. Usually asked for in innovation and SME grants; typical only, not this funder’s list. Check the official listing.

  • Business or project plan
  • Company registration documents
  • Latest financial statements
  • Project budget and cost breakdown
  • CVs of the key team members
  • State aid or de minimis declaration, where relevant