This tender has closed.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
AgriPV-plant for Chad 2026 Tender
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Chad (Europe). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.
This GIZ tender procures a 2 MWp agrivoltaic (Agri-PV) plant in Chad, including a 2 x 3 MWh battery energy storage system, a 750 kVA generator and a 5 MVA transformer. It suits installers and EPC contractors with solar and storage delivery experience in off-grid or African markets.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
GIZ has published an open-procedure tender (VgV) titled "AgriPV-plant for Chad" for an agrivoltaic plant in Chad. The notice itself does not contain a scope narrative. The scope is described only in the attached documents, which are gated behind participation in the procedure: a "Functional Description Pala" (.docx), "Specifications Pala v2" (.xlsx), and a "Leistungsverzeichnis" (service/item specification, .xlsx). The bidder-facing forms include a letter of bid, exclusion-grounds and eligibility declaration, EU-Russia sanctions declaration, consortium and subcontractor declarations, and export-control questionnaires (Parts 1 and 2). Contract documents include special terms, a draft contract for work and materials, General Purchase Conditions GIZ 2023, and an advance payment guarantee form. Deliverables, quantities, and duration cannot be confirmed from the page text and would need to be read from the locked specification documents. The anchor closing date is 2026-11-03.
Bidder eligibility
Not stated in the page text. Required forms indicate that bidders must provide a self-declaration on exclusion grounds and eligibility, an EU-Russia sanctions self-declaration, and, if applicable, consortium and subcontractor declarations. Export-control questionnaires must also be completed. Technical and financial thresholds, references, and registrations are not disclosed. Access to the documents requires confirming participation in the procedure.
How bids are scored
Not disclosed in the page text. The award procedure is an open procedure under VgV (German Vergabeverordnung). No price/quality split or weightings are shown.
Key requirements
- ✓Design, supply and installation of a 2 MWp Agri-PV plant
- ✓Battery energy storage system of 2 x 3 MWh
- ✓Supply of 750 kVA generator and 5 MVA transformer
CPV codes
Relevant sectors
How this compares
- Compared with 781 similar tenders (renewables in Germany) listed in the last 12 months.
- Similar tenders that state a value range from $53k to $196m, with a median of $1.0m (62 tenders).
- It allows 11 days to respond, shorter than the typical 31 days across 508 similar tenders.
- The same organisation listed 24 other similar tenders here in the last 12 months.
Closest open tenders
- Electricity supply installations – Marienschule, renovation of teaching pool and gym, photovoltaic system
- Solar energy – AgriPV-plant for Chad
- Electricity supply installations – Marienschule, renovation of teaching pool and gym, PV system
- Electricity distribution – Supply of green electricity 2027
- New Road Maintenance Building Construction – Lot 21 Material Boxes
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link