Skip to content
Raise Lens
Tender · TED (EU)Closed

Battery packs – Renewable energy infrastructure delivery Ryck County Energy Cluster

Original: Battery packs – Dostawa instalacji OZE w ramach Przedsięwzięcia pn. „Działania inwestycyjne w zakresie budowy infrastruktury Klastra Energii Powiatu Ryckiego”

GMINA RYKI

Value
Not stated · check listing
Closes
30 Sep 2026Closing date passed
Where
Poland
Contract
Mixed · Government

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Energy Storage, Renewable Energy and Energy Efficiency and 1 other against the sustainability taxonomy rather than matched on keywords.

Summary

Tender for design, supply, installation and commissioning of 891 solar PV systems, 155 energy storage units, and 479 heat pumps across residential and public buildings in Ryck County, Poland. Bidders must be experienced renewable energy and heat pump installers with project management and technical design capabilities.

Summary by Raise Lens from the official notice · 26 Sept 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

Supply, installation, and commissioning of renewable energy infrastructure for the Ryki County Energy Cluster project across three municipalities (Nowodwór, Ryki, Kłoczew). Scope includes: 891 photovoltaic installations on residential and public buildings as electricity generation sources with infrastructure for energy distribution; 155 energy storage systems coupled with renewable energy generation units; and 479 heat pump installations coupled with existing PV systems. All installations require technical design and engineering documentation. Project must comply with DNSH (Do No Significant Harm) principle per EU Regulation 2020/852. Accessibility requirements for persons with disabilities are integrated into design specifications.

Bidder eligibility

Bidders must be qualified contractors capable of delivering complete renewable energy infrastructure projects including design, supply, installation, and commissioning of photovoltaic systems, energy storage systems, and heat pumps. Contractors must comply with EU DNSH principles and accessibility standards for persons with disabilities per Article 100(1) of the Public Procurement Law.

Lots

  • Lot 1: Zadanie nr 1: GMINA NOWODWÓR

    Photovoltaic installations (85 units: 2 public buildings, 83 residential), energy storage systems (14 units for residential buildings), and heat pumps (35 units for residential buildings) with technical design documentation for all objects.

  • Lot 2: Zadanie nr 2: GMINA RYKI

    Photovoltaic installations (673 units: 13 public buildings, 660 residential), energy storage systems (125 units: 13 public buildings, 112 residential), and heat pumps (375 units: 2 public buildings, 373 residential) with technical design documentation for all objects.

  • Lot 3: Zadanie nr 3: GMINA KŁOCZEW

    Photovoltaic installations (133 units: 4 public buildings, 129 residential), energy storage systems (16 units: 4 public buildings, 12 residential), and heat pumps (69 units: 4 public buildings, 65 residential) with technical design documentation for all objects.

Key requirements

  • Design, supply, installation and commissioning of 891 solar PV systems on residential and public buildings
  • Design, supply, installation and commissioning of 155 energy storage systems coupled to PV units
  • Design, supply, installation and commissioning of 479 heat pumps integrated with existing PV installations
  • Technical design documentation and project engineering for all installations
  • Accessibility compliance for persons with disabilities in design and implementation

CPV codes

How this compares

About this sector

Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published17 Sep 2026
Closes30 Sep 2026, 23:59 UTC
Buyer typeGovernment
TypeMixed
MethodOpen
DeliveryOn-site
CountryPoland
RegionEurope
Last verified26 Sep 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)