Skip to content
Raise Lens
Tender · TED (EU)

Building construction work – Technical design and execution for energy renovation of Cluj Administrative Palace

Original: Building construction work – Servicii de proiectare tehnică și execuție lucrări pentru obiectivul: Renovarea energeticǎ moderatǎ, modernizarea şi dotarea clădirii Palatului Administrativ al judeţului Cluj

INSTITUTIA PREFECTULUI JUDETUL CLUJ

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Romania
Contract
Mixed · Government

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Romania and the European Union (Europe). It is classified under Energy Storage, Sustainable Buildings and Energy Efficiency and 1 other against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design and construction services for energy-efficient renovation and modernization of Cluj County Administrative Palace, including technical documentation, project management, and energy performance certification. Bidders should be multi-disciplinary construction/engineering firms with expertise in energy-efficiency retrofit, building design, and compliance with Romanian building codes.

Summary by Raise Lens from the official notice · 19 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Design and execution services for moderate energy renovation, modernization and equipment of Cluj County Administrative Palace. The project comprises four phases: (I) Design services including technical documentation, project authorization, building execution project, technical execution project, execution details, fire safety scenario, technical verification, technical assistance throughout investment period, energy performance certificate, utility connection documentation, and general budget according to HG 907/2016; (II) Execution of all construction and installation works per technical documentation, testing, finalization, reception, defect remediation, utility connections, supply and installation of equipment, and personnel training; (III) Project finalization including ISCIR authorizations, commissioning, metrological verification, testing and inspections, energy performance certificate obtainment, as-built documentation, technical book preparation, and mandatory participation in final reception; (IV) Warranty period with solution provision and defect remediation as needed, final reception with mandatory participation of designer and executor.

Bidder eligibility

Bidders must be capable of providing complete design and execution services. Designer must employ project verification specialists attested by M.D.L.P.A. (different from project designers) per Law 10/1995 on construction quality. Executor must be capable of executing all construction and installation works to technical specifications, obtaining all required authorizations and utility connections, supplying and installing equipment, and personnel training. All parties must comply with Romanian national legal provisions and current technical prescriptions.

Lots

  • Lot I: Design Services Phase

    Elaboration of technical documentation for authorizations, project authorization, building execution project, technical execution project, execution details, fire safety scenario, technical verification, technical assistance, energy performance certificate, utility connection documentation, general budget, and technical file preparation

  • Lot II: Execution of Works Phase

    Execution of all construction and installation works per technical documentation, testing, finalization, reception, defect remediation, utility connections and branching, supply and installation of equipment and machinery, commissioning, and personnel training on equipment use

  • Lot III: Project Finalization and Final Reception Phase

    ISCIR authorizations, commissioning, metrological verification, testing and inspections, energy performance certificate obtainment, as-built documentation, technical book preparation, mandatory participation in final reception, and presentation of designer report

  • Lot IV: Warranty Period Phase

    Provision of solutions and technical perspectives as requested, remediation of deteriorated works during warranty period, final reception with mandatory participation of designer and executor

Key requirements

  • Elaboration of technical documentation for building and construction permits and utility connections
  • Design of moderate energy renovation with technical execution project (P.T.), executive details (D.E.), and fire safety scenario
  • Project verification by certified inspectors (M.D.L.P.A.) compliant with Law 10/1995 on construction quality
  • Energy performance certificate by certified energy auditor post-execution
  • Technical assistance throughout investment period from designer
  • General budget elaboration per HG 907/2016 for public-funded investment projects

CPV codes

How this compares

About this sector

Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published12 May 2026
Buyer typeGovernment
TypeMixed
DeliveryOn-site
CountryRomania
RegionEurope
CurrencyRON
Last verified19 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)