Construction of electrical infrastructure for Port Polska investment, including substations and 110 kV cable lines

Original: Construction work – Budowa infrastruktury zasilającej inwestycję Port Polska, w tym budynki RPZ (110 kV/15 kV), budynek stacji GPO-C (110 kV/15 kV), budynki stacji agregatów prądotwórczych oraz linie kablowe 110 kV łączące inwestycję Port Polska z krajową siecią elektroenergetyczną

Centralny Port Komunikacyjny sp. z o.o.

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Poland
Contract
Works · Soe

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland (Europe). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures construction of electrical infrastructure for Poland's Central Communication Port, including 110 kV substations, distribution centers, and cable lines connecting to the national grid. Bidders must have substantial experience in high-voltage electrical infrastructure design, construction, and SCADA systems integration.

Summary by Raise Lens from the official notice · 12 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Construction of power supply infrastructure for Port Polska investment, including RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), power generator station buildings, and 110 kV cable lines connecting Port Polska investment to the national power grid. The procurement is divided into 7 tasks within a single contract: Task 1 - construction and design works for connection to 110/110 kV PGE Station with 110 kV lines on east and south sides of airport; Task 2 - construction and design for RPZ-1 Distribution Point Station with SCADA system; Task 3 - construction and design for RPZ-2 Distribution Point Station with SCADA system; Task 4 - construction and design for RPZ-3 Distribution Point Station with SCADA system; Task 5 - construction and design for RPZ-4 Distribution Point Station with SCADA system; Task 6 - construction and design for connection to 400/110 kV PSE Station with 110 kV lines on west and north sides of airport; Task 7 - construction and design for GPO-C station with 110 kV network connection and SCADA system.

Lots

  • Lot 1: Connection to 110/110 kV PGE Station with 110 kV lines

    Construction and design works for connection to Stacji 110/110 kV PGE with 110 kV lines on eastern and southern sides of airport

  • Lot 2: RPZ-1 Distribution Point Station

    Construction and design works for RPZ-1 Distribution Point Station with SCADA system

  • Lot 3: RPZ-2 Distribution Point Station

    Construction and design works for RPZ-2 Distribution Point Station with SCADA system

  • Lot 4: RPZ-3 Distribution Point Station

    Construction and design works for RPZ-3 Distribution Point Station with SCADA system

  • Lot 5: RPZ-4 Distribution Point Station

    Construction and design works for RPZ-4 Distribution Point Station with SCADA system

  • Lot 6: Connection to 400/110 kV PSE Station with 110 kV lines

    Construction and design works for connection to Stacji 400/110 kV PSE with 110 kV lines on western and northern sides of airport

  • Lot 7: GPO-C Station

    Construction and design works for GPO-C station with 110 kV network connection and SCADA system

Key requirements

  • Design and construction of 110 kV/15 kV substations (RPZ-1, RPZ-2, RPZ-3, RPZ-4)
  • Construction of GPO-C station with 110 kV connection and SCADA system
  • Installation of 110 kV cable lines connecting to national grid (PGE and PSE networks)
  • Integrated SCADA control systems for all distribution points
  • High-voltage electrical infrastructure expertise and project management capability

CPV codes

Relevant sectors

Grid Mod tendersInfrastructure

How this compares

About this sector

Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published17 Aug 2026
Buyer typeSoe
TypeWorks
DeliveryOn-site
CountryPoland
RegionEurope
Last verified12 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)