Electrical installation work – AIR-PRON: BUD aircraft stand infrastructure development
Original: Electrical installation work – AIR-PRON: BUD állóhelyek infrastruktúra fejlesztés
Budapest Airport Budapest Liszt Ferenc Nemzetközi Repülőtér Üzemeltető Zártkörűen Működő Részvénytársaság
- Value
- Not stated · check listing
- Closes
- 15 Dec 2026
- Where
- Hungary
- Contract
- Works · Corporate
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a corporate buyer covering construction and works. Delivery covers Hungary and the European Union (Europe). It is classified under Heating and Cooling, Sustainable Buildings and Sustainable Aviation and 2 others against the sustainability taxonomy rather than matched on keywords.
Summary
Budapest Airport is procuring design and build works for 11/0.4kV transformer stations, cable connections and new electrical routes that power pre-conditioned air (PCA) and ground power units (GPU) at several airport stands and piers. It suits experienced electrical contractors with airport or high-voltage substation delivery experience, as the work is phased and includes permitting, execution design and documentation.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Budapest Airport, is procuring design and construction services for the improvement of existing electrical supply infrastructure, under the project AIR-PRON: BUD állóhelyek infrastruktúra fejlesztés. The winning bidder must deliver the complete design and construction of 11/0.4 kV transformer station connections, supply cable connections and cable routes, according to the technical documentation and draft contract included in the tender documents. The work is phased. Phase 1 covers new electrical routes at T2A for PCA equipment and at Cargo Apron PH1 for GPU equipment. Phase 2 covers an 11/0.4 kV transformer station and supply cable connections at PIER B, plus a new 11 kV route supplying the new PIER B transformer station. Phase 3 covers new electrical routes at T2B for PCA equipment and at PIER B for PCA and GPU equipment. Phase 4 covers new electrical routes at PIER 1 for GPU equipment. Inside the building, the transformer station reception room must be fitted out with the elements specified in the technical brief and approved plan, including three 2000 kVA 11/0.4 kV transformers, KÖF switchgear and distribution boards. The contractor's design scope includes full permitting and execution drawings for all phases and phase-specific organisation plans, plus complete as-built documentation meeting the contract requirements. Quantities stated include about 1,544 m of directional drilling (Cargo Apron 338 m, PIER 1 1,000 m, PIER B 206 m), about 3,999 m of 11 kV underground cable (three parallel cables), and about 598.5 m² of outdoor basalt concrete paving. The overall expected duration is not stated on the page.
Lots
- Lot 1: Meglévő áramellátási infrastruktúra fejlesztése (Improvement of existing electrical supply infrastructure)
Complete design and construction of 11/0.4 kV transformer station and supply cable connections and routes across four phases: T2A and Cargo Apron PH1; PIER B (transformer station, 11 kV route); T2B and PIER B; PIER 1. Includes three 2000 kVA transformers, KÖF switchgear, distribution boards, about 1,544 m directional drilling, about 3,999 m 11 kV cable, and about 598.5 m² basalt concrete paving.
Key requirements
- Design and build of 11/0.4kV transformer stations, including 3 x 2000 kVA transformers and switchgear
- New electrical cable routes and 11 kV line for PCA and GPU equipment at T2A, T2B, Cargo Apron PH1, PIER B and PIER 1
- Phased execution with permitting, execution design, organisation plans and full as-built documentation
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
Named in this notice. Check the official notice for the full list.
- Complete permitting drawings (engedélyezési tervek) for all phases
- Execution drawings (kiviteli tervek) for all phases
- Organisation plans (organizációs tervek) for each construction phase
- Complete as-built documentation (megvalósulási dokumentáció)