Electricity – green power procurement for 91 sites, Wald und Holz NRW 2026 Tender
Original: Electricity – Beschaffung von Ökostrom für die Verbrauchsstellen beim Landesbetrieb Wald und Holz Nordrhein-Westfalen
In context
This is a contract notice published by a government body covering the supply of goods. Delivery covers Germany (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
The state forestry agency Wald und Holz NRW seeks an all-inclusive green electricity supply contract for 91 metering points, with the supplier handling grid usage and network charges, at an estimated 850,000 kWh per year. It suits electricity suppliers able to deliver certified renewable power and manage grid-fee arrangements with network operators.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Wald und Holz NRW, the state enterprise for forests and wood in North Rhine-Westphalia, is procuring electricity supply for its consumption points. The supply covers multiple metering points (Abnahmestellen/Marktlokationen), currently 91 in number. The contract is intended as an all-inclusive electricity supply agreement. The chosen supplier must contractually arrange grid use with each relevant grid operator, and the grid usage fees are included in the electricity price offered and agreed at award. The supplier is responsible for paying these grid fees to the grid operators. The estimated annual consumption is 850,000 kWh across the 91 metering points. This figure is a calculation basis for bid preparation only. Actual consumption depends on demand and may be higher or lower than the estimate. Further details are in the tender documents, particularly the service specification (Leistungsbeschreibung). The contract duration is not stated on this page.
Key requirements
- ✓All-inclusive green electricity supply contract covering 91 metering points
- ✓Supplier must contractually handle grid usage and pay network operators' charges
- ✓Estimated consumption of 850,000 kWh per year, with actual volume variable
CPV codes
Relevant sectors
How this compares
- Compared with 786 similar tenders (renewables in Germany) listed in the last 12 months.
- Similar tenders that state a value range from $53k to $196m, with a median of $1.0m (62 tenders).
- It allows 30 days to respond, shorter than the typical 31 days across 513 similar tenders.
- The same organisation listed 1 other similar tender here in the last 12 months.
Closest open tenders
- New multi-storey car park Adenau Wimbachstraße, Lot 4 electrical building services planning
- Electrical, security and IT installations - photovoltaic systems DIN 18382 - 2375/2026
- WVK electricity supply 2027 for treatment plant, extraction facilities and dam
- Electricity procurement Landkreis Forchheim for delivery years 2027–2029
- Electricity supply for ZSW in Stuttgart and Ulm
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →