Skip to content
Raise Lens
Tender · TED (EU)Closed

Engineering design: environmental documentation for national road 44 expansion, Oświęcim

Original: Engineering design services – Opracowanie dokumentacji projektowej STEŚ dla zadania pn.: „Rozbudowa drogi krajowej nr 44 na odcinku Oświęcim - Zaborze - Oświęcim (proces przygotowawczy)"

Generalna Dyrekcja Dróg Krajowych i Autostrad

Value
Not stated · check listing
Closes
17 Nov 2026Closing date passed
Where
Poland
Contract
Services · Government

In context

This is a contract notice published by a government body covering services. Delivery covers Poland (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

A Polish national road authority (GDDKiA) is procuring design services for the environmental decision-stage documentation (STEŚ), including geological studies, traffic analysis, and an environmental decision (DŚU), for widening national road 44 near Oświęcim. Suited to established engineering-design firms with road, geotechnical, and environmental expertise; the climate link is indirect.

Summary by Raise Lens from the official notice · 13 Nov 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The Generalna Dyrekcja Dróg Krajowych i Autostrad (GDDKiA) is procuring engineering design services to prepare the STEŚ (studium techniczno-ekonomiczno-środowiskowe, a techno-economic and environmental feasibility study) for the expansion of national road DK44 between Oświęcim and Zaborze (Oświęcim–Zaborze–Oświęcim), covering approximately km 56+300 to 58+500 (about 2.2 km). The work covers the preparatory process, including obtaining an environmental decision (Decyzja o Środowiskowych Uwarunkowaniach, DŚU). The investment will follow the existing DK44 alignment, with a possible partial new route, for example from the junction with ul. Porębska to the new connection with ul. Fabryczna. The design must address the interfaces of the rebuilt section and the design tie-in, and the contractor must check whether the existing cross-section can be expanded to 2x2 lanes, confirmed by the necessary calculations. The basic scope includes: analysis of input materials, collection and review of archival materials, and surveys, tests, calculations and expert opinions; preliminary definition of the physical and financial scope and project effectiveness; traffic analysis and forecast, including requesting input data and guidelines from the GDDKiA Head Office Strategy and Studies Department for the AiPR; preparation of the STEŚ map; development of reconstruction and/or expansion variants with basic technical parameters of structures; geotechnical testing programme and geological-engineering study; preparation and approval of the geological works design and hydrogeological documentation; natural environment observations and inventory; environmental analyses; refinement of geometric solutions, road structures, engineering structures, land boundaries, bills of quantities and cost estimates for key elements across variants; road safety (BRD) opinion and audit materials; multi-criteria analysis for selecting the preferred technical variant, with criteria and weights agreed with the Contracting Authority; information supporting the preliminary investment decision; participation in the ZOPI meeting; and preparation of the DŚU application for the chosen variant and obtaining the DŚU. An optional scope is also foreseen at the Contracting Authority's discretion: preparation of the environmental impact report (raport o oddziaływaniu przedsięwzięcia na środowisko) as part of TER stage II. Option details are set out in the PPU (Volume II of the SWZ). The expected contract duration is …

Key requirements

  • Prepare STEŚ design documentation including geological study, traffic forecast, and environmental analyses for km 56+300 to 58+500
  • Obtain the Environmental Conditions Decision (DŚU) and assess feasibility of a 2x2 cross-section with calculations
  • Perform field measurements, geotechnical surveys, and nature inventories alongside desk design work

CPV codes

Relevant sectors

Infrastructure

How this compares

About this sector

Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published2 Nov 2026
Closes17 Nov 2026
Buyer typeGovernment
TypeServices
DeliveryHybrid
CountryPoland
RegionEurope
Last verified13 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)