This tender has closed. The deadline passed 124 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Heat pumps – design, delivery, installation and commissioning of 2 photovoltaic systems, 2 energy storage systems and 1 heat pump – part II 2026 Tender
organisation
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Heating and Cooling, Renewable Energy and Energy Storage and 1 other against the sustainability taxonomy rather than matched on keywords.
This tender procures design, delivery, installation, and commissioning of renewable energy infrastructure for a Polish municipality: 2 photovoltaic systems (11 kWp and 50 kWp with bifacial cells), 2 energy storage systems (9 kWh and 40 kWh), and 1 air-source heat pump (200 kW minimum) for public buildings. Bidders must be experienced renewable energy and HVAC integrators capable of hybrid system design, PV installation, battery storage deployment, and heat pump commissioning.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
The municipality (the funder) is procuring the design, supply, installation and commissioning of renewable energy infrastructure for selected public utility buildings within the municipality. The contract — titled 'Infrastruktura OZE w Gminie Widawa' — covers Part II and includes one complete factory-new heat pump installation, two complete factory-new photovoltaic installations, and two energy storage systems. …
CPV codes
The direct link to bid is a Pro feature.