Skip to content
Raise Lens
TENDER · World Bankmultilateralsupplies

Mali Hybrid Solar System Extension: 120 kWh Storage, 100 kWp Peak Power 2026 Tender

Original: Mali, Extension du Système Solaire Hybride — 120 kWh Stockage le renforcement de la salle serveur avec une capacité de stockage portée à 30 kWh & Puissance Crête Optimisée à 100 kWc

Mali Connectivity and Road Resilience Program

In context

This is a contract notice published by a multilateral institution covering the supply of goods. Delivery covers Mali. It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.

Summary

Extends a hybrid solar system in Mali for a server room, raising battery storage to 30 kWh and optimising peak PV capacity to 100 kWp. Suited to solar installers and energy-storage integrators with West African off-grid experience.

Summary by Raise Lens from the official notice · 2 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Extension du Système Solaire Hybride — 120 kWh Stockage le renforcement de la salle serveur avec une capacité de stockage portée à 30 kWh & Puissance Crête Optimisée à 100 kWc

Key requirements

  • ✓Extend hybrid solar system to 100 kWp peak capacity
  • ✓Increase storage to 30 kWh for server room reinforcement
  • ✓Deliver installation at Mali sites before closing 2026-11-10

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.