Epcor - Negotiated Request for Proposal - South Edmonton Area Load Reliability – Distribution and Transmission Study
Epcor
- Value
- Not stated · check listing
- Closes
- 3 Dec 2026
- Where
- Canada
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering consulting. Bids are invited through a negotiated procedure. Delivery covers Canada (NORTH-AMERICA). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
EPCOR, with the AESO, is procuring a consulting study to assess, compare and report on alternative distribution and transmission solutions for forecast electricity capacity shortfalls in south-west Edmonton. It suits engineering consultancies with power-system planning expertise, including environmental and land-use assessment capability.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
A government buyer in Canada is procuring a consulting study through a negotiated request for proposal to assess, compare and report on alternative distribution and transmission solutions for forecast electricity capacity shortfalls in south-west Edmonton. The work is a consulting contract. The successful bidder may also be considered for first right of refusal on follow-on conceptual routing and siting services. Bids are submitted through a third-party portal, which may require an account. The notice was published on 9 November 2026 and closes on 3 December 2026 at 14:01 UTC. The estimated contract period is 47 months.
Full description from the source
EPCOR Distribution and Transmission Inc. (EDTI), together with the Alberta Electric System Operator (AESO), is assessing solutions to address forecast distribution deficiency in the Chappelle area of South-West Edmonton. Forecast load growth in the area, currently served by EDTI's distribution system downstream of the Summerside and Riverview substations, is expected to exceed available capacity within the next 5 years. The successful Proponent (the Consultant) must assess, evaluate and compare each alternative under consideration on viability, constructability, cost, environmental and land use effects, and risk. The Consultant must produce a report on all alternatives, including comparative metrics, which AESO will use as an input to determine the preferred alternative for the project. The successful Proponent may be granted first right of refusal for additional services related to conceptual routing and siting during the term of the Agreement. The Owner may, at its sole discretion, negotiate scope, schedule and pricing with the successful Proponent, and may seek services from other qualified parties. The estimated contract period is 47 months, with a proposed start date of 2027-01-01. EPCOR makes no representations or warranties about the accuracy or completeness of the NRFP information, and proponents must carry out their own evaluation of the information and data provided.
Key requirements
- Assess viability, constructability, costs, environmental and land-use effects, and risks of each alternative
- Produce a report with comparative metrics to inform AESO's preferred-alternative decision
- Possible first right of refusal for follow-on conceptual routing and siting services
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
How this compares
- Compared with 20 similar tenders (grid mod in Canada) listed in the last 12 months.
- It allows 25 days to respond, shorter than the typical 27 days across 19 similar tenders.
- The same organisation listed 12 other similar tenders here in the last 12 months.
Closest open tenders
- Epcor - Negotiated Request for Proposal - Intelligent Electronic Device Management Software
- RISE - MSB Substation Upgrades
- North South Transmission System Interconnection Project
- Dorsey Convertor Station To Wash’ake Mayzoon Station - Transmission Line
- City of Medicine Hat - Negotiated Request for Proposal - CMH26-122 - UDS Substation Modernization -Supply of Medium Voltage 15 kV Switchgear & Circuit Breakers
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)