Skip to content
Raise Lens
Tender · TED (EU)

Solar photovoltaic modules – design-build installation on Opava municipal kindergarten

Original: Solar photovoltaic modules – Instalace FVE formou design and build na objektech Statutárního města Opavy - MŠ Šrámkova 6

Statutární město Opava

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Czech Republic
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Czechia and the European Union (Europe). It is classified under Renewable Energy, Energy Storage and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Design-and-build installation of a solar photovoltaic system (26.88 kWp minimum) with battery storage (50 kWh minimum) on a municipal kindergarten building roof in Opava, Czech Republic. Bidders should be renewable-energy installers or engineering firms with proven solar PV and energy-storage system integration experience.

Summary by Raise Lens from the official notice · 22 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Installation of a solar photovoltaic (FVE) system on the roof of a municipal building (MŠ Šrámkova 6) operated by Statutární město Opava. The system shall have a minimum installed capacity of 26.88 kWp and include a battery storage system with a minimum capacity of 50 kWh. The contract is for design and build (design-build) delivery of the complete photovoltaic installation.

Key requirements

  • Solar PV system installation minimum 26.88 kWp capacity
  • Battery energy storage system minimum 50 kWh capacity
  • Design-and-build (turnkey) contract structure
  • Installation on municipal kindergarten building roof

CPV codes

Relevant sectors

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published7 Sep 2026
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryCzech Republic
RegionEurope
CurrencyCZK
Last verified22 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)