Solar photovoltaic modules – PV plants, Znojmo water treatment and wastewater plant
Original: Solar photovoltaic modules – FVE VAS, ÚV Znojmo a ČOV Dobšice
VODÁRENSKÁ AKCIOVÁ SPOLEČNOST, a.s.
- Value
- Not stated · check listing
- Closes
- 1 Dec 2026
- Where
- Czech Republic
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Delivery covers Czechia (Europe). It is classified under Renewable Energy, Energy Storage and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The tender procures construction and installation of rooftop-scale solar photovoltaic plants and battery storage systems at two water utility sites in Znojmo, Czech Republic, co-funded by the Modernization Fund RES+ programme. It suits experienced Czech or regional solar EPC contractors with electrical installation capacity; a small SME could realistically sub into or bid on the work.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contracting authority, Vodárenská akciová společnost, a.s. (a Znojmo water utility), is procuring the design, supply, construction and installation of photovoltaic (PV) power plants and battery energy storage systems at two of its sites in Znojmo, under the contract documentation and its annexes. At the Úpravna vody Znojmo (ÚV Znojmo, water treatment plant), the scope is a PV plant with a total permitted output of 332.64 kW, comprising 616 PV modules of 540 Wp and 3 inverters of 100 kW each, plus a battery storage system with a capacity of 1,200 kWh and an installed power of 360 kW. At the Čistírna odpadních vod Znojmo (ČOV Znojmo, wastewater treatment plant), the scope is a PV plant with a total permitted output of 294.26 kW, comprising 474 PV modules (141 of 540 Wp and 333 of 655 Wp) and 17 inverters rated 10, 15 and 20 kW, plus a battery storage system with a capacity of 2,400 kWh and an installed power of 360 kW. The PV plants are intended to generate electricity for the sites' own consumption and for charging the batteries, with any surplus exported to the distribution network. The project is co-financed by an EU-funded programme under the Modernization Fund call ModF–RES+ No. 4/2025, Programme 2 (New Renewable Energy Sources in Energy, RES+), and the grant conditions are available on the Modernization Fund website and in Annex 7. Detailed technical requirements are set out in the project documents PD_VŘ_FVE ČOV Znojmo and PD_VŘ_FVE ÚV Znojmo and in Annex 2 (Technical Specification). The contract duration and delivery deadlines are not stated on the page.
Key requirements
- Supply, build and install PV plants at ÚV Znojmo (332.64 kW) and ČOV Znojmo (294.26 kW)
- Install battery storage: 1200 kWh at ÚV Znojmo and 2400 kWh at ČOV Znojmo, each 360 kW
- Funded under ModF RES+ call 4/2025; subsidy conditions apply
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)