Skip to content
Raise Lens
TENDER · germany-bmigovernmentconsulting

Technical Planning Pre-Feed Readiness Offshore Hydrogen Pipeline HYBHC 2026 Tender

Original: Technische Planung zur Pre-Feed Readiness der Offshore Wasserstoff-Pipeline HYBHC

GASCADE Gastransport GmbH

In context

This is a contract notice published by a government body covering consulting. Bids are invited through an open procedure. Delivery covers Germany and the European Union (Europe). It is classified under Hydrogen and e-Fuels and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures technical planning and pre-feed readiness assessment services for the German section of the Baltic Sea Hydrogen Collector offshore pipeline project, focusing on technical, spatial, safety, and permitting analysis. Bidders should be engineering consultancies or hydrogen infrastructure specialists with offshore pipeline and hydrogen project experience.

Summary by Raise Lens from the official notice · 4 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Gegenstand der Ausschreibung ist die Beschaffung fachlicher Unterstützungsleistungen zur weiteren technischen Konkretisierung und Bewertung des deutschen Abschnitts (HYBHC) im Projekt "Baltic Sea Hydrogen Collector" (BHC). Die zu vergebenden Leistungen dienen dazu, die vorhandenen Projektgrundlagen zu systematisieren, wesentliche technische, räumliche, sicherheitsbezogene und genehmigungsrelevante Randbedingungen zu untersuchen und daraus belastbare Grundlagen für die weitere Projektentwicklung abzuleiten. Im Mittelpunkt steht nicht die Umsetzung baulicher Maßnahmen, sondern die vorbereitende fachliche Durchdringung zentraler Fragestellungen, die für die spätere Planung, Bewertung und Entscheidungsfindung erforderlich sind. Die ausgeschriebenen Leistungen sollen damit einen Beitrag leisten, den Reifegrad des Vorhabens zu erhöhen, Risiken frühzeitig einzuordnen und die nächsten Projektphasen strukturiert vorzubereiten.

Key requirements

  • ✓Systematize existing project foundations and technical documentation
  • ✓Investigate technical, spatial, safety and permitting boundary conditions for German HYBHC section
  • ✓Derive reliable baseline data for subsequent project development phases
  • ✓Increase project maturity level and early risk assessment
  • ✓Prepare structured foundation for planning, evaluation and decision-making

Relevant sectors

Hydrogen tendersInfrastructure

How this compares

  • Compared with 74 similar tenders (hydrogen in Germany) listed in the last 12 months.
  • It allows 34 days to respond, longer than the typical 30 days across 43 similar tenders.
  • The same organisation listed 10 other similar tenders here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Hydrogen and e-fuels funding supports electrolysers, production plants, storage, transport and end uses in industry, shipping and aviation. Support is often tied to low-carbon production standards and offtake from named users. Calls commonly ask for a site, a supply of renewable power and a consortium that covers production through to demand.