Skip to content
Raise Lens
TENDER · spain-pcsp-regionalgovernmentworks

Vinyassa football pitch lighting replacement and electrical installation legalisation 2026 Tender

Original: L’objecte del contracte consisteix en substituir l’enllumenat del terreny de joc del camp de futbol de la Vinyassa, millorant l’eficiència energètica de la instal·lació aconseguint una reducció del consum energètic. També té per objecte actualitzar i legalitzar la instal·lació elèctrica de l’edifici adaptant-lo a la normativa de seguretat industrial després de diverses modificacions realitzades al llarg del temps.

Ajuntament de Roses

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Spain (Europe). It is classified under Energy Efficiency against the sustainability taxonomy rather than matched on keywords.

Summary

The Roses town council is replacing the floodlighting on the Vinyassa football pitch to cut energy use, and upgrading the building's electrical installation to current industrial safety rules. It suits electrical contractors and lighting installers with experience in energy-efficient sports lighting and low-voltage legalisation works.

Summary by Raise Lens from the official notice · 30 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Id licitación: 2026/008751; Importe: 66245.05 EUR; Estado: EN PLAZO

Key requirements

  • ✓Replace pitch floodlighting with more energy-efficient equipment to reduce consumption
  • ✓Update and legalise the building's electrical installation to industrial safety regulations
  • ✓Onsite electrical works at the Vinyassa football field facility in Roses, Spain

Relevant sectors

About this sector

Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.