Funding route · apply any time
- Amount
- NOK 101.1M
- Deadline
- Rolling: no fixed deadline
- Who can apply
- SMEs, large companies, start-ups · Norway
Free accounts: 1 official link a month · Pro: every link
In context
This call is open to small and medium-sized businesses, large companies and startups. Funding is a grant. Coverage is read from the notice itself: Norway.
Summary
Enova's Batteri i nullutslippsskip programme co-funds the incremental cost of battery-electric vessels, including newbuilds and conversions, plus dedicated charging infrastructure. It is aimed at Norwegian shipping companies investing in zero-emission vessels, with funding allocated through competitive bidding.
About this grant
The call funds the extra cost of battery-electric vessels over a conventional ship, whether newbuilds or conversions, aiming to bring down the premium that currently holds back the move to zero-emission shipping. Charging infrastructure needed to run a funded project can also be included. Applicants must be shipping companies, either vessel owners or long-term operators holding an agreement of at least five years, registered in the Norwegian business register and meeting the general state aid rules. Eligible organisation types are SMEs, large companies and startups. Match funding of 20 percent is required. Early-stage applicants cannot use this call and should look to the separate early-stage maritime technology programme instead. Processing typically takes two to four months.
Full description from the source
Batteri i nullutslippsskip is an Enova support programme for shipping companies that want to invest in battery-electric vessels. It addresses the high extra cost of battery propulsion compared with conventional vessels, which currently slows the switch to zero-emission shipping. The programme aims to lower costs for maritime batteries and make battery solutions more competitive, supporting a faster green transition in the shipping sector. Support covers the incremental (merkostnad) cost of investing in battery-electric vessels, whether newbuilds or conversions. Because zero-emission operation depends on available charging, the programme can also fund dedicated charging infrastructure needed to operate the vessels in a project. Applicants who want to study a project before applying for this support can apply for early-stage funding through the separate Forprosjekt maritim teknologi programme. Enova distributes funds by competitive bidding, so projects compete for a limited budget and only the highest-ranked applications receive support.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
Eligibility
Eligible applicants are companies planning to invest in battery-electric vessels, provided the applicant is either the vessel owner or a long-term operator with an agreement of at least five years. The company must be registered in the Norwegian business register (foretaksregisteret) and meet the general state aid requirements. Supported vessels must be registered in the Norwegian ship register (NOR or NIS) and, as a general rule, operate at least one third of their activity in Norway.
How it's scored
Support is allocated through a competitive bidding process in which projects compete for a limited budget, and only the applications ranked highest receive funding. The page does not publish specific scoring criteria, weightings or panel composition. Processing time is stated as 2 to 4 months, and dialogue between Enova and applicants during case handling is strictly regulated.
Key requirements
- Project must involve investing in battery-electric vessels, either newbuilds or conversions, by a shipping company
- Support covers the incremental (merkostnad) cost compared with a conventional vessel; charging infrastructure needed for the project can be included
- Applications compete for a limited budget through competitive bidding and only the highest-ranked projects are funded
Frequently asked questions
Frequently asked questions
- How much funding does Enova offer?
- Batteri I Nullutslippsskip offers NOK 101.1M.
- When is the Batteri I Nullutslippsskip deadline?
- This is a rolling call with no fixed deadline, so applications are accepted on an ongoing basis.
- Who can apply for Batteri I Nullutslippsskip?
- Eligibility covers SMEs, large companies and start-ups in Norway. See the eligibility criteria above for the full conditions.
Relevant sectors
How this compares
How this compares
- Compared with 9 similar grants (shipping in Norway) listed in the last 12 months.
- Its value of $9.5m is above 43% of the 7 similar grants that state a value; their median is $33m.
- The same organisation listed 8 other similar grants here in the last 12 months.
Closest open grants
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this listing. Usually asked for in capital grants; typical only, not this funder’s list. Check the official listing.
- Project plan with timeline and milestones
- Quotes or cost estimates for the works or equipment
- Proof of ownership, lease or permission for the site
- Planning permission or permits, where needed
- Evidence of match funding
- Latest annual accounts