Battery energy storage system 20 MW / 40 MWh: design, supply, construction, commissioning
Original: Construction work for industrial buildings – Errichtung Batteriespeicher, Los 2: Planung, Lieferung, Errichtung, Inbetriebnahme und Abnahme eines Battery Energy Storage System (BESS) mit einer Leistung von bevorzugt 20 MW und einer Kapazität von mindestens 40MWh als 2-Std.-Speicher, einschließlich Energiemanagementsystem, Brandschutz, Schallschutz, Leittechnische-Anbindung, EZA-Regler, Wartungs- und Servicevertrag, Schulung und Dokumentation
SWE Energie GmbH
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Germany
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Bids are invited through an open procedure. Delivery covers Germany (Europe). It is classified under Electric Mobility, Energy Storage and Grid Modernisation and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
Design, supply, construction, and commissioning of a 20 MW / 40 MWh battery energy storage system (BESS) with ancillary systems (EMS, fire/noise protection, grid connection, controls, maintenance, training). Bidders must be BESS integrators or EPC contractors with proven large-scale battery storage delivery and grid-interconnection expertise.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Design, supply, construction, commissioning and acceptance of a Battery Energy Storage System (BESS) with preferred capacity of 20 MW and minimum 40 MWh (2-hour storage) at HKW Erfurt Ost. The turnkey scope includes: battery containers with internal DC cabling, battery management systems, fire protection and suppression systems, early fire detection, internal climate control, inverter skids for outdoor installation, self-consumption transformers, noise protection measures, control/regulation systems, energy management system, grid connection to two parallel 10kV feeds, VDE 4110/4120 certification support, staff training, operations and maintenance contract, and full documentation. The system must support multiple applications: grid services (PRL, aFRR, mFRR, optional Momentanreserve), market-based operation (arbitrage, intraday/day-ahead/continuous intraday trading), and reactive power control per VDE-AR-4110. Parallel operation of two identical 10 MW / 20 MWh battery units is planned. Contractor responsibility includes complete planning, delivery, assembly, commissioning, and operational handover with commercial operation target of 01 July 2028.
Bidder eligibility
Bidders must have experience with large-scale battery storage systems deployment, grid-connected energy storage, power electronics integration, and compliance with German grid connection standards (VDE 4110, VDE 4120). KRITIS regulatory compliance experience required (operator subject to KRITIS directive). Technical capability to design and deliver turnkey BESS with minimum 40 MWh capacity and 20 MW power output, manage regulatory approvals (building permits, grid connection), and provide ongoing maintenance/service contracts. Financial standing sufficient to deliver EUR multi-million infrastructure project.
Lots
- Lot 2: Battery Energy Storage System (BESS) – Design, Supply, Installation, Commissioning and Acceptance
Turnkey delivery of 20 MW / 40 MWh BESS including battery containers, inverter skids, transformers, fire protection, noise protection, control systems, energy management system, grid connection to two parallel 10 kV feeds, commissioning, testing, certification support per VDE 4110/4120, staff training, and maintenance contract
Key requirements
- 20 MW power / 40 MWh capacity (two 10 MW / 20 MWh units in parallel)
- Ancillary systems: energy management system (EMS), fire protection, noise control, grid-connection (10 kV dual-feed), reactive-power control per VDE-AR-4110, short-circuit current limiting
- Operational capabilities: frequency regulation (PRL, aFRR, mFRR, optional inertia), market-based arbitrage (intraday, day-ahead, continuous intraday), grid-support services
- Outdoor installation (battery containers, skids, transformers, switchgear)
- Full EPC scope: planning, supply, construction, commissioning, handover, maintenance contract, training, documentation
- Commercial operation target: 1 July 2028
Relevant sectors
How this compares
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)