This tender closed on 30 June 2026. The deadline passed 148 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Battery packs – "Construction of energy storage facilities in Zabrodzie Municipality".
Original: Battery packs – "Wykonanie magazynów energii na terenie Gminy Zabrodzie".
Gmina Zabrodzie
- Value
- Not stated · check listing
- Closes
- 30 Jun 2026Closing date passed
- Where
- Poland
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Energy Storage, Renewable Energy and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures design, supply, and installation of battery energy storage systems (totalling 179 kWh) paired with existing solar PV installations across 50 residential homes and 4 public buildings in Gmina Zabrodzie, Poland. Bidders should be specialised energy storage integrators with experience in battery pack deployment, system design, and dedicated energy management software integration.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The subject of the contract is the design and subsequent delivery with installation of energy storage systems (battery packs) for existing photovoltaic installations in 50 residential buildings and 4 public utility facilities located within the Municipality of Zabrodzie (Gmina Zabrodzie). The scope covers both design and supply-with-installation phases, carried out in accordance with the Functional-Utility Programme (PFU) forming the Description of the Subject of the Contract (Annex 1a for residential buildings, Annex 1b for public utility buildings, and Annex 1c specifying installation types for residential buildings). For public utility buildings, the energy storage capacities to be installed are: at least 5 kWh (1 unit), at least 7 kWh (2 units), and at least 10 kWh (1 unit). For single-family residential buildings, the capacities are: at least 6 kWh (25 units) and at least 10 kWh (25 units), totalling 50 residential units. All energy storage systems must be brand-new and must meet the technical requirements set out in section 6.1.2.2 of the PFU, including compatibility with a dedicated IT management system described in section 11 of the PFU. The installations are intended to serve the energy needs of the respective buildings and are sized to match the production capacity of the existing renewable energy (photovoltaic) systems already in place. A list of specific installation sites is provided in the PFU tables for public utility objects and in Annex 1 to the PFU for residential buildings.
Key requirements
- Design and installation of battery energy storage systems (6–10 kWh for residential, 5–10 kWh for public buildings)
- Factory-new battery packs meeting specified technical requirements and energy capacity thresholds
- Integration with dedicated energy management software system (described in section 11 of the functional programme)
- Installation across 50 single-family homes and 4 public utility buildings on Gmina Zabrodzie territory
- Compatibility with existing renewable energy (PV) installations
Relevant sectors
How this compares
About this sector
About this sector
Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)