Project Engineer function services for methane fermentation and composting plant construction 2026 Tender

Original: Architectural, construction, engineering and inspection services – (25) Pełnienie funkcji Inżyniera Projektu w zadaniu: „Budowa instalacji do fermentacji metanowej odpadów oraz budowa kompostowni w części przeznaczonej do stabilizacji frakcji podsitowej (0-80 mm) wraz z niezbędną infrastrukturą towarzyszącą na terenie zakładu „EKO DOLINA” Sp. z o.o. w Łężycach”

Eko Dolina Sp. z o.o.

In context

This is a contract notice published by a state-owned enterprise covering services. Delivery covers Poland and the European Union (Europe). It is classified under Renewable Energy, Waste Reduction and Circular Economy and 1 other against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures Project Engineer services for the design, construction, and commissioning of an anaerobic digestion facility and composting plant for waste stabilization at an industrial waste-management site in Poland. The role requires site-based engineering oversight, quality assurance, and risk management throughout a design-build project; bidders must have proven experience in waste-to-energy infrastructure and construction supervision.

Summary by Raise Lens from the official notice · 24 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Eko Dolina Sp. z o.o., is procuring Project Engineer (Inżynier Projektu, IP) services for the design-and-build project "Budowa instalacji do fermentacji metanowej odpadów oraz budowa kompostowni" at its EKO DOLINA facility in Łężyce (84-207 Koleczkowo, al. Parku Krajobrazowego 99). The project covers a methane fermentation (dry anaerobic digestion) plant for waste, a composting facility for the 0-80 mm undersieve fraction, supporting infrastructure, mobile equipment supply, and related works, delivered under a 'design and build' formula by a separate works contractor. The IP service includes verifying and reviewing the works contractor's design documentation, performing investor supervision under the Polish Building Law, monitoring progress, quality and safety against the contract and schedule, identifying and resolving technical and operational problems, coordinating communication among investment participants, preparing progress and final reports, and managing project risks. The works are split into four stages: Stage I (design documentation and final building permit), Stage II (technical design, construction and demolition works, energy modernisation of the existing biogas plant, equipment supply, staff training, mechanical and technological commissioning, permits, and product registration for digestate), Stage III (initial operation), and Stage IV (warranty service and maintenance, 36 months for buildings and networks and 24 months for mobile equipment and machinery from final acceptance of Stage II). The contractor must also insure the project for its duration per Annex 3 to the contract. The detailed service description is in Annex 4 to the SWZ (draft contract terms and attachments). The contract duration is not stated on this page beyond the warranty periods tied to Stage II acceptance.

Bidder eligibility

Not specified in the text provided. The page references SWZ (Specyfikacja Warunków Zamówienia) and its annexes for detailed requirements. Bids involving services from third countries that are not parties to international agreements are not admitted, per art. 16b ust. 2 of the Polish Public Procurement Law (uPzp).

How bids are scored

Not disclosed in the text provided. No price/quality split or weightings are stated on this page.

Key requirements

  • ✓Verification and approval of project documentation for completeness, correctness, and regulatory compliance
  • ✓Investment supervision duties under Polish Building Law and quality/safety monitoring throughout design-build execution
  • ✓Technical problem-solving, risk analysis, progress reporting, and stakeholder communication across the project lifecycle
  • ✓Expertise in anaerobic digestion, composting infrastructure, and waste-management facility construction

How this compares

  • Compared with 271 similar tenders (renewables in Poland) listed in the last 12 months.
  • It allows 15 days to respond, shorter than the typical 22 days across 193 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.