Skip to content
Raise Lens

This tender has closed.

You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.

TENDER · TED (EU)governmentmixed

Solar installation: supply and assembly of PV system with energy storage at kindergarten 24 2026 Tender

Original: Solar installation – Dostawa i montaż instalacji fotowoltaicznej w PP nr 24 z magazynem energii wraz z dokumentacją - w ramach projektu: Odnawialne źródła energii w budynkach użyteczności publicznej w Jastrzębiu-Zdroju

Miasto Jastrzębie-Zdrój

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.

Summary

The tender procures design, supply, installation and commissioning of a 19.8 kWp rooftop solar PV microinstallation with a minimum 10 kW / 20 kWh battery energy storage system at a public kindergarten in Jastrzębie-Zdrój, Poland, plus project documentation. It suits SME solar installers and electrical contractors with Polish microinstallation experience and an engineering capability for the design work.

Summary by Raise Lens from the official notice · 26 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contracting authority, the City of Jastrzębie-Zdrój, is procuring the design, supply, installation and commissioning of a photovoltaic (PV) installation, together with the required project documentation, at Public Kindergarten No. 24 (Publiczne Przedszkole nr 24), ul. Aleksandra Fredry 15, Jastrzębie-Zdrój. The procurement is part of the project 'Renewable energy sources in public utility buildings in Jastrzębie-Zdrój'. The required parameters are a PV generator of 19.8 kWp, classified as a micro-installation under the Polish Renewable Energy Sources Act, and an electrical energy storage (MEE) unit with a minimum power of 10 kW and minimum usable capacity of 20 kWh. The PV system will connect to the building's internal electrical installation. Energy generated is consumed on site in real time; surplus energy is first routed to the storage unit and, once it is charged, exported to the grid and settled under net-billing at the monthly Market Energy Price rate. The installation does not require changes to the grid connection conditions or a concession. The full scope is set out in the Description of the Subject of Procurement (OPZ, annex 6 to the SWZ, which is annex 2 to the contract). The works are carried out with the participation of a Contract Engineer, PPUH INSTAL-PROJEKT Sp. z o.o., Gołkowice. The buyer permits equivalent solutions to any referenced standards or technical specifications, provided the bidder demonstrates that the offered supplies or services meet the buyer's requirements. Expected delivery duration is not stated in the notice excerpt.

Bidder eligibility

Not specified in the notice excerpt provided. The full SWZ (Polish public procurement specification) would set out the bidder eligibility requirements.

How bids are scored

Not specified in the notice excerpt provided.

Key requirements

  • ✓Design, supply, install and commission 19.8 kWp PV microinstallation at Przedszkole nr 24, Jastrzębie-Zdrój
  • ✓Battery energy storage system minimum 10 kW power and 20 kWh usable capacity
  • ✓Net-billing settlement compatible setup and full project documentation; equivalent solutions permitted with proof

How this compares

  • Compared with 271 similar tenders (renewables in Poland) listed in the last 12 months.
  • It allows 11 days to respond, shorter than the typical 22 days across 193 similar tenders.
  • The same organisation listed 1 other similar tender here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.