Turbine generator sets – hydropower energy recovery system installation at Bogdanka mine 2026 Tender
Original: Turbine generator sets – „Zabudowa układu hydroenergetycznego do odzysku energii elektrycznej z zrzucanej wody z powierzchni na poziom 795 rurociągiem DN 200, wraz z włączeniem instalacji do sieci elekroenergetycznej i instalacji przeciwpożarowej kopalni LW Bogdanka w polu Bogdanka” - zgodnie z postanowieniami SWZ
Lubelski Węgiel Bogdanka S.A. w Bogdance
In context
This is a contract notice published by a corporate buyer covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
A Polish coal producer, Lubelski Węgiel Bogdanka, is procuring the installation of a hydropower turbine-generator system that recovers energy from water discharged through a DN 200 pipeline to level 795, including grid connection and integration with the mine's fire-fighting system. Bidders suited to this are hydropower equipment suppliers and electrical/mechanical contractors with mining-site installation experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Lubelski Węgiel Bogdanka S.A. w Bogdance, is procuring the installation of a hydropower system to recover electrical energy from water discharged from the surface to level 795 through a DN 200 pipeline at the Bogdanka mine (LW Bogdanka, Bogdanka field). The scope includes connecting the installation to the electrical power network and to the mine's fire-protection installation. The notice title refers to turbine generator sets. The notice states that the detailed scope is set out in Part III of the SWZ (Specification of Subject Matter of Contract, Opis Przedmiotu Zamówienia). The procurement is a sectoral contract under Article 7(35) of the Polish Public Procurement Law (Pzp). The page does not state deliverables, the contract duration, or the implementation timetable.
Key requirements
- ✓Supply and installation of hydropower turbine-generator set on DN 200 water discharge pipeline
- ✓Connection of the generation installation to the mine electrical network
- ✓Integration with the mine fire-fighting water installation
- ✓Works conducted per SWZ specification (Part III Scope of Work)
Relevant sectors
How this compares
- Compared with 271 similar tenders (renewables in Poland) listed in the last 12 months.
- It allows 8 days to respond, shorter than the typical 22 days across 193 similar tenders.
- The same organisation listed 2 other similar tenders here in the last 12 months.
Closest open tenders
- Solar installation: supply and assembly of PV system with energy storage at kindergarten 24
- Design and build of complete biowaste preparation module for co-digestion at WWTP
- Solar panel roof installation with energy storage—design and build
- Electricity purchase for Bielsko-Biała waste company with PV energy buyback
- Electricity supply for solar-equipped facilities, Upper Silesian Metropolis purchasing group
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →