Solar panel roof installation: design, permitting and construction for Tecuci hospital 2026 Tender

Original: Solar panel roof-covering work – Servicii elaborare proiect tehnic, DTAC, detalii de execuție, asistența tehnica proiectant, verificare tehnică si execuție lucrari pentru obiectivul de investiții «INFRASTRUCTURA DE PRODUCERE A ENERGIEI REGENERABILE PENTRU SPITALUL MUNICIPAL ANTON CINCU TECUCI»

JUDETUL GALATI

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Romania (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This Romanian public tender procures design, technical documentation, permitting support, technical verification and construction of a solar panel roof-covering renewable energy plant for a municipal hospital in Tecuci. It suits an engineering and construction firm with solar PV design and installation capability, and an SME could bid as a sub-contractor or single-lot bidder.

Summary by Raise Lens from the official notice · 28 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Județul Galați (Galați County Council), is procuring design, technical verification and execution services for the investment objective "Infrastructura de producere a energiei regenerabile pentru Spitalul Municipal Anton Cincu Tecuci", which covers a solar panel installation on the roof of the municipal hospital in Tecuci. The title is an English rendering of the Romanian notice; the scope is a combined design-and-build contract. The service scope includes preparing the technical project (Proiect Tehnic, PT), execution design (Detalii de Execuție, DE), the technical documentation for obtaining authorisation (DTAC), the documentation for execution of works (DTOE), and the technical documentation needed to obtain the required opinions, agreements and permits. It also covers the designer's technical assistance, technical verification of the design, and execution of the works. Expected duration: the design and documentation services are to run for 60 days from the service commencement order. The works execution is to run for 10 months from the works commencement order.

Key requirements

  • ✓Design package: technical project (PT), execution details (DE), DTAC permit documentation and technical verification
  • ✓Permit and authorisation documentation completed within 60 days of service start order
  • ✓Construction works completed within 10 months of works start order

Relevant sectors

Renewables tendersInfrastructure

How this compares

  • Compared with 44 similar tenders (renewables in Romania) listed in the last 12 months.
  • Similar tenders that state a value range from $121k to $11m, with a median of $646k (8 tenders).
  • It allows 24 days to respond, shorter than the typical 35 days across 28 similar tenders.
  • The same organisation listed 4 other similar tenders here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.