Summary

Romsilva's Direcția Silvică Argeș is procuring a turnkey 2.7 kWp off-grid solar PV system with a hybrid inverter and 11.7 kWh LiFePO4 battery storage, including supply, ground mounting, protections, earthing, commissioning and handover. Suited to Romanian solar installers and electrical SMEs able to deliver a single small on-site installation.

Summary by Raise Lens from the official notice · 17 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Regia Națională a Pădurilor – Romsilva through its Direcția Silvică Argeș, is procuring a complete off-grid solar photovoltaic system with storage, titled in the notice as a 2.7 kW PV system with storage. The notice specifies one complete unit with minimum components: at least 6 monocrystalline N-type PV panels of at least 460 Wp each (minimum installed capacity 2.76 kWp); one single-phase hybrid inverter of at least 6 kW; one LiFePO4 battery of at least 11.7 kWh with an integrated heating system; one ground-mounted metal mounting structure set; DC and AC protections; solar cables, connectors, AC cables and earthing; and an earth electrode (execution and measurement). The scope also includes transport, installation, configuration, testing and commissioning of the system. The notice does not state the delivery period, installation timeline or warranty terms.

Key requirements

  • ✓Minimum 6 monocrystalline N-type panels of at least 460 Wp each (minimum 2.76 kWp)
  • ✓Single-phase hybrid inverter of minimum 6 kW plus LiFePO4 battery of minimum 11.7 kWh with integrated heating
  • ✓Ground-mount metal structure, DC/AC protections, earthing, transport, installation, commissioning and grounding measurement

CPV codes

How this compares

  • Compared with 44 similar tenders (renewables in Romania) listed in the last 12 months.
  • Similar tenders that state a value range from $121k to $11m, with a median of $646k (8 tenders).
  • It allows 33 days to respond, shorter than the typical 35 days across 28 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Closes 17 Nov 2026
Get the official link (free account)

Free accounts: 1 official link a month · Pro: every link

Quick facts

SourceTED (EU)
Published15 Oct 2026
Closes17 Nov 2026
Buyer typegovernment
Typemixed
DeliveryOn-site
CountryRO
RegionEurope
CurrencyGBP
Last verified17 Oct 2026

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →