Solar PV installation for 300 kW renewable energy plant, Valea Iasului 2026 Tender

Original: Solar installation – Furnizare, montare, instalare, testare și punere în funcțiune a sistemului fotovoltaic aferent obiectivului „IMPLEMENTAREA UNEI NOI CAPACITĂȚI DE PRODUCȚIE DE ENERGIE ELECTRICĂ DIN SURSE REGENERABILE CEF 300KW-LOCALITATEA VALEA IAȘULUI, JUDEȚUL ARGEȘ’’

COMUNA VALEA IASULUI (PRIMARIA COMUNEI VALEA IASULUI)

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Romania (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.

Summary

The Romanian commune of Valea Iașului is procuring the supply, installation, testing and commissioning of a 300 kW solar photovoltaic plant as part of a renewable energy capacity project with a budget of about 1.13 million RON excluding VAT. A small or mid-sized solar installer with EPC capability and local presence in Argeș county fits this single-site works and supply contract.

Summary by Raise Lens from the official notice · 25 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Comuna Valea Iașului (Primăria Comunei Valea Iașului, Argeș county, Romania), is procuring the supply, mounting, installation, testing and commissioning of a photovoltaic system for the project 'Implementarea unei noi capacități de producție de energie electrică din surse regenerabile CEF 300KW, Localitatea Valea Iașului, Județul Argeș'. The scope is a 300 kW renewable electricity generation capacity. The page content provided is only a budget breakdown, so deliverables beyond the title, the contract duration and the detailed technical specifications are not stated. The budget breakdown lists: 4.1 Construction and installations 413,382.81; 4.2 Mounting of machinery, technological and functional equipment 154,667.19; 4.3 Machinery, technological and functional equipment with mounting 561,950.00; total 1,130,000.00. These figures are given without an explicit currency and appear to be in local currency (likely RON) and exclusive of VAT. They have not been converted to USD.

Key requirements

  • ✓Supply, installation, testing and commissioning of a 300 kW solar PV system
  • ✓Works, equipment supply and assembly lots totalling about 1,130,000 RON excluding VAT
  • ✓Located in Valea Iașului commune, Argeș county, Romania

Relevant sectors

How this compares

  • Compared with 44 similar tenders (renewables in Romania) listed in the last 12 months.
  • Similar tenders that state a value range from $121k to $11m, with a median of $646k (8 tenders).
  • It allows 14 days to respond, shorter than the typical 35 days across 28 similar tenders.
  • The same organisation listed 2 other similar tenders here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.