Solar panel roof installation design and build services for Targu Bujor hospital 2026 Tender
Original: Solar panel roof-covering work – “Servicii elaborare proiect tehnic, DTAC, detalii de execuție, asistența tehnica proiectant, verificare tehnică si execuție lucrari pentru obiectivul de investiții “INFRASTRUCTURA DE PRODUCERE A ENERGIEI REGENERABILE PENTRU SPITALUL ORASENESC TARGU BUJOR”
JUDETUL GALATI
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Romania (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
A Romanian county council tender for design, permitting, technical verification and construction of a renewable energy (solar PV) roof-covering installation for Targu Bujor town hospital. Suited to engineering-design firms and solar EPC contractors capable of combined design-and-build work, likely through a Romanian local bidder with EU-funding compliance experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
“Servicii elaborare proiect tehnic, DTAC, detalii de execuție, asistența tehnica proiectant, verificare tehnică si execuție lucrari pentru obiectivul de investiții “INFRASTRUCTURA DE PRODUCERE A ENERGIEI REGENERABILE PENTRU SPITALUL ORASENESC TARGU BUJOR” Durata de prestare a serviciilor de elaborare PT, DE, DTAC, DTOE, Documentaţii tehnice necesare în vederea obţinerii Avizelor/ acordurilor/ autorizaţiilor va fi de 60 zile de la Ordinul de începere a serviciilor. Durata de execuţie a lucrărilor va fi de 8 luni de la Ordinul de începere a lucrărilor.
Key requirements
- ✓Technical design (PT), execution details (DE), and building permit documentation (DTAC) within 60 days of service order
- ✓Construction of solar PV roof installation with 8-month works duration from work order
- ✓Technical verification and designer technical assistance during execution
Relevant sectors
How this compares
- Compared with 44 similar tenders (renewables in Romania) listed in the last 12 months.
- Similar tenders that state a value range from $121k to $11m, with a median of $646k (8 tenders).
- It allows 24 days to respond, shorter than the typical 35 days across 28 similar tenders.
- The same organisation listed 4 other similar tenders here in the last 12 months.
Closest open tenders
- Solar PV installation for 300 kW renewable energy plant, Valea Iasului
- Capital repair of power supply system (photovoltaic panel installation) at three military units
- Solar roof works: design and execution, Galati county emergency hospital
- Solar panel roof installation: design, permitting and construction for Tecuci hospital
- Solar installation – supply and mounting of 2.7 kW photovoltaic system with storage
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →