Skip to content
Raise Lens
Tender · TED (EU)

Solar photovoltaic modules – Green energy – Renewable installations in Bieruń municipality

Original: Solar photovoltaic modules – Zielona energia – Budowa instalacji OZE w Gminie Bieruń

Gmina Bieruń reprezentowana przez Burmistrza Miasta Bierunia

Value
Not stated · check listing
Closes
30 Nov 2026
 
Where
Poland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 28 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 2 Nov 202628 days to prepare
Found today · 25 Nov 20265 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Renewable Energy, Energy Storage and Grid Modernisation against the sustainability taxonomy rather than matched on keywords.

Summary

The Gmina Bieruń municipality is procuring the supply and installation of photovoltaic microinstallations on 8 public buildings, energy storage for 9 buildings, modernisation of protective switchgear, and production-monitoring systems, co-financed by the EU Just Transition Fund. Suited to Polish electrical and PV installation contractors able to deliver works of this scale, likely as a single-lot job.

Summary by Raise Lens from the official notice · 12 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contracting authority, Gmina Bieruń (represented by the Mayor of the Town of Bieruń), is procuring the supply and installation of complete photovoltaic microinstallations for 8 public-use facilities, the installation of energy storage systems for 9 buildings, and the modernisation of an existing fire-protection circuit-breaker installation. The scope also includes the general construction works needed to support these installations and a energy production monitoring system. The detailed scope is set out in the Specification of Essential Terms (SWZ) and its annexes, including the detailed description of the subject matter (OPZ) and the draft contract terms, which are not reproduced in the notice text. The contract is co-financed by the European Union under the Fundusze Europejskie dla Śląskiego 2021-2027 programme, Just Transition Fund, Priority FESL.10.00 (European Funds for Transition), Action FESL.10.06 (Development of distributed energy based on renewable energy sources). The notice is a Polish public procurement under the Public Procurement Law (ustawa Prawo zamówień publicznych). The contracting authority requires that the contractor or subcontractors employ, under employment contracts, the persons performing the work described in Article 22 §1 of the Polish Labour Code. Verification and control arrangements are set out in the draft contract. Variant bids are not permitted, and partial bids (by lot) are not permitted. Settlements are made in PLN only. No framework agreement, dynamic purchasing system, e-auction or electronic catalogue is planned. Contract duration is not stated in the notice text.

Bidder eligibility

Not stated in the notice text. Bidder eligibility, conditions for participation, required experience and financial thresholds are referred to the SWZ, which is not included in the provided page content.

How bids are scored

Not stated in the notice text. Award criteria, price/quality weightings and scoring method are referred to the SWZ.

Key requirements

  • Supply and installation of PV microinstallations on 8 public buildings
  • Energy storage installation for 9 buildings and production monitoring system
  • Modernisation of protective switchgear plus related general construction works; EU Funds for Silesia 2021-2027 co-financing

CPV codes

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published2 Nov 2026
Closes30 Nov 2026
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryPoland
RegionEurope
Last verified12 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)