Skip to content
Raise Lens
Tender · TED (EU)

Solar photovoltaic modules – PV plants, Znojmo water treatment plant and Dobšice WWTP

Original: Solar photovoltaic modules – FVE VAS, ÚV Znojmo a ČOV Dobšice

VODÁRENSKÁ AKCIOVÁ SPOLEČNOST, a.s.

Value
Not stated · check listing
Closes
10 Dec 2026
 
Where
Czech Republic
Contract
Works · Utility

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 45 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 26 Oct 202645 days to prepare
Found today · 25 Nov 202615 days to prepare

In context

This is a contract notice published by a utility covering construction and works. Delivery covers Czechia (Europe). It is classified under Renewable Energy, Energy Storage and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

The tender procures design, construction and installation of rooftop-scale solar photovoltaic plants and battery storage at two wastewater/water treatment sites in Znojmo, co-funded by the Modernisation Fund RES+ programme. It suits local Czech electrical and PV installation contractors, including SMEs able to deliver or subcontract under a single works contract.

Summary by Raise Lens from the official notice · 17 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contract covers the design, supply, construction and installation of solar photovoltaic (PV) power plants and battery energy storage systems at two sites operated by the contracting authority, Vodárenská akciová společnost, a.s., as set out in the tender documentation and its annexes. The contracting authority will conclude a contract with the selected supplier. At the Znojmo water treatment plant (ÚV Znojmo), the scope is a PV plant with a total permitted output of 332.64 kW, comprising 616 panels of 540 Wp and 3 inverters rated 100 kW, plus a battery storage system of 1,200 kWh with 360 kW installed power. At the Znojmo wastewater treatment plant (ČOV Znojmo), the scope is a PV plant with a total permitted output of 294.26 kW, comprising 474 panels (141 of 540 Wp and 333 of 655 Wp) and 17 inverters rated 10, 15 and 20 kW, plus a battery storage system of 2,400 kWh with 360 kW installed power. The PV plants will generate electricity for self-consumption and for charging the batteries. Any surplus electricity will be fed into the distribution network. The project is co-financed by the EU under the Modernisation Fund call ModF–RES+ No. 4/2025, Programme 2 (New Renewable Energy Sources in Energy, RES+). Funding conditions are published at www.modernizacni-fond.cz and in Annex No. 7 (Podmínky dotace). The detailed technical scope is specified in the project documents PD_VŘ_FVE ČOV Znojmo and PD_VŘ_FVE ÚV Znojmo and in Annex No. 2 (Technical Specification). The expected contract duration is not stated in the notice text provided.

Lots

  • Lot 1: ÚV Znojmo – PV plant and battery storage at Znojmo water treatment plant

    PV plant with 332.64 kW permitted output: 616 panels of 540 Wp, 3 inverters of 100 kW; battery storage of 1,200 kWh / 360 kW installed power.

  • Lot 2: ČOV Znojmo – PV plant and battery storage at Znojmo wastewater treatment plant

    PV plant with 294.26 kW permitted output: 474 panels (141 × 540 Wp, 333 × 655 Wp), 17 inverters of 10, 15 and 20 kW; battery storage of 2,400 kWh / 360 kW installed power.

Key requirements

  • Build PV plants totalling about 332 kW at Znojmo water treatment plant and about 294 kW at Znojmo WWTP
  • Supply and install 1200 kWh and 2400 kWh battery storage systems, each 360 kW
  • Projects co-financed under Modernisation Fund ModF-RES+ call 4/2025, so grant conditions apply

CPV codes

Relevant sectors

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published26 Oct 2026
Closes10 Dec 2026
Buyer typeUtility
TypeWorks
DeliveryOn-site
CountryCzech Republic
RegionEurope
CurrencyCZK
Last verified17 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)