This tender has closed. The deadline passed 73 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Electricity Power Lines — procurement of energy storage system components for a grid-connected battery storage facility in Poland 2026 Tender
organisation
In context
This is a contract notice published by a state-owned enterprise covering the supply of goods. Delivery covers Poland and the European Union (Europe). It is classified under Energy Storage, Renewable Energy and Grid Modernization against the sustainability taxonomy rather than matched on keywords.
This tender procures components for an electrical energy storage system to be built at a Polish power-generation company's site. Bidders should be energy storage system integrators, battery manufacturers, or specialized suppliers with experience in large-scale grid-connected storage installations.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
The tender concerns the supply of components for an Electrical Energy Storage System (EESS) for the construction project of the MEE ELKO I electrical energy storage facility located at the funder Wytwarzanie Sp. z o.o. site in Świerże Górne, Poland. The procurement is issued by the funder Wytwarzanie Sp. z o.o., a state-owned energy generation company. The detailed scope of supply is defined in Part II of the Specification of Terms and Conditions of the Order (SWZ). The contract involves delivery of components required to build and commission the battery energy storage system at the specified site.
Relevant sectors
The direct link to bid is a Pro feature.