Design services for Zdziarska Street and Żerański Canal bridge – preparatory works 2026 Tender

Original: Engineering design services – Opracowanie projektu budowlanego i projektów wykonawczych oraz uzyskanie decyzji administracyjnych niezbędnych do wykonania robót budowlanych w ramach realizacji zadania pn. „Budowa ul. Zdziarskiej na odcinku od ul. Ostródzkiej do ul. Płochocińskiej wraz z mostem nad Kanałem Żerańskim – prace przygotowawcze”.

Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy Miasta

In context

This is a contract notice published by a government body covering services. Delivery covers Poland (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This Warsaw city tender procures design and permitting services for the preparatory stage of the Zdziarska Street road project, including a bridge over the Kanał Żerański. It suits engineering design firms and consultancies with road, bridge and environmental permitting experience, rather than climate-specific specialists.

Summary by Raise Lens from the official notice · 28 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, Miasto Stołeczne Warszawa (Stołeczny Zarząd Rozbudowy Miasta), is procuring engineering design services for the preparatory phase of the project "Budowa ul. Zdziarskiej na odcinku od ul. Ostródzkiej do ul. Płochocińskiej wraz z mostem nad Kanałem Żerańskim" (construction of Zdziarska Street between Ostródzka and Płochocińska Streets, including a bridge over the Żerański Canal). The notice covers the preparation of the building design and execution-stage designs, and the obtaining of the administrative decisions needed to carry out the construction works. The listed deliverables are: (1) preparatory works; (2) an environmental conditions decision (DŚU), including all necessary studies such as the Project Information Card (KIP); (3) a road investment construction permit with all documentation needed for the works; (4) promotional and information materials; (5) the building design with geotechnical documentation; (6) execution designs; (7) technical specifications for the execution and acceptance of construction works; (8) maps showing the proposed land subdivision; (9) bills of quantities; (10) a water law permit with the water law documentation; (11) the investor's cost estimate and a cost estimate form for bidders; (12) answers to contractor questions and any modifications to the documents during the tender procedure; (13) copyright supervision during construction; and (14) transfer of intellectual property rights, including copyright in all work produced, together with consents and authorisations to modify the works and exercise derivative rights. The notice does not state the contract duration, milestones, or delivery schedule on the page provided.

Key requirements

  • ✓Prepare building and execution design documentation, including geotechnical documentation and specifications
  • ✓Obtain environmental decision (DŚU) and road construction permit, plus water-law permit with operating documentation
  • ✓Provide bill of quantities, investor cost estimate, land-division maps, and author supervision during works

Relevant sectors

Infrastructure

How this compares

  • Compared with 20 similar tenders (infrastructure in Poland) listed in the last 12 months.
  • It allows 14 days to respond, shorter than the typical 17 days across 20 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.