Feasibility study, environmental decision and geological design for Strzelce Opolskie bypass 2026 Tender

Original: Architectural, construction, engineering and inspection services – Opracowanie Studium Techniczno-Ekonomiczno-Środowiskowego (STEŚ) wraz z uzyskaniem Decyzji o Środowiskowych Uwarunkowaniach, a także opracowaniem Projektu Robót Geologicznych (PRG) na potrzeby wykonania dokumentacji geologiczno-inżynierskiej dla zadania „Budowa obwodnicy Strzelec Opolskich w ciągu drogi krajowej nr 94.”

Generalna Dyrekcja Dróg Krajowych i Autostrad

In context

This is a contract notice published by a government body covering consulting. Delivery covers Poland (Europe). It is classified under Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

GDDKiA is procuring a feasibility study (STEŚ) with an environmental decision (EIA) and a geological works project for a 9 km bypass of Strzelce Opolskie on national road 94. Bidders best suited are engineering design and environmental consultancies, with geological survey capacity or subcontracting for the field work.

Summary by Raise Lens from the official notice · 2 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement covers preparation of a Techno-Economic-Environmental Study (STEŚ, Studium Techniczno-Ekonomiczno-Środowiskowe) and obtaining the Decision on Environmental Conditions (Decyzja o Środowiskowych Uwarunkowaniach) for the 'Budowa obwodnicy Strzelec Opolskich w ciągu drogi krajowej nr 94' project. It also includes preparing a Geological Works Project (Projekt Robót Geologicznych, PRG) to support geological-engineering documentation. The investment aims to divert transit traffic away from the urban area, improve the town's road capacity and traffic safety, and reduce noise, emissions and heavy-vehicle nuisance. It is also intended to make national road no. 94 a functioning alternative route to the A4 motorway. The scope of the wider investment includes a new road section of roughly 9 km, engineering structures (viaducts and culverts), additional carriageways, pedestrian and cycle paths, a road maintenance depot, junctions and reconstruction of conflicting roads, traffic safety and environmental protection devices, road lighting, a technological duct, utility relocations or new networks (storm and sanitary sewers, gas, power, telecom, water supply, weather station, traffic signals), and tree felling with replanting. The design documentation scope includes: (1) the STEŚ; (2) traffic measurements with traffic analysis and forecast; (3) geotechnical testing programme, geological-engineering study, geological works project, hydrogeological documentation, and geological and geotechnical drilling; (4) natural-environment inventory; (5) materials for the environmental decision application, including the project information card (KIP); (6) the environmental impact report (raport OOS); (7) public information meetings with residents; (8) road safety assessment (BRD) and road safety audit (BRD audit). The notice does not state the expected contract duration.

Key requirements

  • ✓Prepare STEŚ feasibility study and secure environmental decision (EIA)
  • ✓Prepare geological project (PRG) and geological-engineering documentation, including field investigations
  • ✓Provide traffic counts, traffic forecasts and hydrogeological documentation for the bypass

Relevant sectors

Buildings tendersInfrastructure

How this compares

  • Compared with 17 similar tenders (infrastructure in Poland) listed in the last 12 months.
  • It allows 12 days to respond, shorter than the typical 15 days across 17 similar tenders.
  • The same organisation listed 1 other similar tender here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.