Motor vehicles – purchase of two vans and electric cargo car for PSZOK 2026 Tender
Original: Motor vehicles – Zakup i dostawa dwóch samochodów dostawczych oraz samochodu elektrycznego osobowego z przestrzenią ładunkową na potrzeby PSZOK w Ostrowcu Świętokrzyskim.
Gmina Ostrowiec Świętokrzyski
In context
This is a contract notice published by a government body covering the supply of goods. Delivery covers Poland (Europe). It is classified under Electric Mobility and Circular Economy against the sustainability taxonomy rather than matched on keywords.
The Gmina Ostrowiec Świętokrzyski is procuring two 3.5-tonne utility vans (one high-sided tipper, one double-cab with tipper body) and one electric passenger vehicle with cargo space for its mobile recycling collection point (PSZOK). Suited to vehicle dealers or suppliers able to deliver fleet-grade commercial vehicles to a Polish municipality.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers the purchase and delivery of fixed assets and equipment for a mobile PSZOK (municipal collection point for selected waste fractions) in Ostrowiec Świętokrzyski. The tender is titled "Purchase and delivery of light commercial vehicles with a maximum permissible gross weight of up to 3.5 t". The scope includes three vehicles: (a) one diesel light commercial vehicle up to 3.5 t, 3-seat, with a high-body tipper superstructure; (b) one diesel light commercial vehicle up to 3.5 t, double-cab, fitted with a body with tipper function; and (c) one electric passenger vehicle with a cargo area. All vehicles must be brand-new and manufactured no earlier than 2027. The page does not state the delivery deadline or contract duration.
Key requirements
- ✓Two fabrically new 3.5t vans: one high-body tipper, one double-cab with tipper body, diesel engines
- ✓One electric passenger vehicle with cargo space for the mobile PSZOK
- ✓Vehicles must be new with production date no earlier than 2027
Relevant sectors
How this compares
- Compared with 165 similar tenders (e-mobility in Poland) listed in the last 12 months.
- It allows 32 days to respond, longer than the typical 29 days across 104 similar tenders.
- The same organisation listed 6 other similar tenders here in the last 12 months.
Closest open tenders
- Purchase and distribution of electricity for railway traction 2027–2031 with 2032 option
- Site preparation work – design and construction for EV charging station grid connection
- Design and construction works: grid connection of EV charging station, Domanin
- Electric buses – procurement of zero-emission fleet with charging infrastructure, part II
- Engineering design services for regional road 724 expansion bicycle pedestrian path
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →