Solar photovoltaic modules – Increasing renewable energy production in Brzeziny City – Stage III 2026 Tender
Original: Solar photovoltaic modules – Zwiększenie produkcji energii ze źródeł odnawialnych na terenie Miasta Brzeziny – Etap III.
MIASTO BRZEZINY
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.
The Brzeziny municipality is procuring a simplified design, then supply, installation and commissioning of at least 0.616 MW of rooftop-style solar PV systems with at least 1.065 MWh of battery storage for 100 households. Suited to installers and renewable-energy integrators with residential PV delivery experience, including SMEs that can work as a single contractor or subcontractor.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contracting authority, the City of Brzeziny (Poland), is procuring a turnkey photovoltaic project under the title "Zwiększenie produkcji energii ze źródeł odnawialnych na terenie Miasta Brzeziny – Etap III" (Increasing renewable energy production in the City of Brzeziny, Stage III). The scope comprises three sequential deliverables: (1) preparation of simplified design documentation; (2) on the basis of that documentation, delivery of photovoltaic installations with a total capacity of at least 0.616 MW for 100 households in the city of Brzeziny; and (3) installation and commissioning of those systems. Each household installation is to be equipped with electricity storage with a total capacity of at least 1.065 MWh. The technical requirements are set out in the functional-utility programme (program funkcjonalno-użytkowy), which forms Annex No. 10 to the Specification of Essential Terms of the Contract (SWZ). The page does not state the contract duration or delivery and completion milestones.
Key requirements
- ✓Prepare simplified design documentation based on the functional-utility programme (SWZ annex 10)
- ✓Supply, install and commission PV installations totalling at least 0.616 MW for 100 households
- ✓Include energy storage systems with total capacity of at least 1.065 MWh
CPV codes
Relevant sectors
How this compares
- Compared with 271 similar tenders (renewables in Poland) listed in the last 12 months.
- It allows 34 days to respond, longer than the typical 22 days across 193 similar tenders.
- This is the only similar tender from this organisation listed here in the last 12 months.
Closest open tenders
- Solar installation: supply and assembly of PV system with energy storage at kindergarten 24
- Design and build of complete biowaste preparation module for co-digestion at WWTP
- Solar panel roof installation with energy storage—design and build
- Electricity purchase for Bielsko-Biała waste company with PV energy buyback
- Electricity supply for solar-equipped facilities, Upper Silesian Metropolis purchasing group
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →