Solar photovoltaic modules – supply and installation of 499.8 kWp ground-mounted plant
Original: Solar photovoltaic modules – Zakup i montaż na konstrukcji gruntowej kompletnej instalacji fotowoltaicznej o łącznej mocy ok. 499,8 kWp
REKO PRIME SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
- Value
- Not stated · check listing
- Closes
- 7 Dec 2026
- Where
- Poland
- Contract
- Mixed · Corporate
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.
In context
This is a contract notice published by a corporate buyer covering a mix of works, supplies and services. Delivery covers Poland (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A Polish private company seeks supply and installation of a complete ground-mounted on-grid solar PV plant of about 499.8 kWp with 768 modules, five inverters and zero-export operation for self-consumption. Suited to SMEs and EPC installers with solar PV construction experience in Poland.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
8 kWp, to be run in zero-export self-consumption mode. The scope comprises 768 modules rated 650 Wp each, arranged on a ground-mounted structure, and five inverters with a combined rating of 440 kW (three of 80 kW and two of 100 kW) at 400 V. Equivalent components are permitted, and the installation must follow the included technical design and the grid connection conditions. The buyer is a Polish private company, and the procedure is an inquiry procured under a mixed contract. The published value is not listed. Bidders must meet the mandatory conditions jointly, and failure to satisfy the basic requirements leads to rejection. These require the offer to match the stated scope and comply with the specification, provide the minimum warranty periods, offer Polish-language warranty service with defined response times, and meet the delivery deadlines of 6 and 4 months. The procurement is open to businesses active in Poland, and the sector tags are renewable energy and engineering infrastructure. The notice was published on 20 November 2026 and closes on 7 December 2026.
Full description from the source
REKO PRIME Sp. z o.o. is procuring the supply and installation of a complete ground-mounted photovoltaic installation with a total capacity of approximately 499.8 kWp, under inquiry no. 01C/REKO/PV/2026 dated 19.11.2026. The installation is an on-grid, ground-mounted system operating in self-consumption mode with zero-export to the grid, as required by the grid connection conditions and the technical design. The installation must be built in accordance with the design documents held by the contracting authority, including the technical design and the preliminary design WP/054071/2025/O08R00 of 02.09.2025. Access to these documents is governed by Chapter VIII of the inquiry. The specified system comprises 768 modules rated 650 Wp each (arithmetic sum 499.20 kWp), with a maximum system voltage of 1500 V DC and a minimum efficiency of 24%. It includes five inverters with a combined rated power of 440 kW (3 x 80 kW and 2 x 100 kW) at 400 V. DC cabling is routed in dedicated trays under the modules and in sealed protective conduits between strings and inverters. The ground-mount structure is to be built per the technical design. The contractor must supply and commission a control, metering and monitoring system. Required functions include automatic active power limitation and reverse-power protection for zero-export, continuous production and operating-parameter measurement, historical data logging to verify annual yield, and interactive client access to production and fault data. The specified components include e2TANGO, an SPV RM power-guard energy park controller, a SmartLogger 3000A, RS485 links, SCADA communication with OSD, and WiFi or LAN modules on the inverters. Equivalent solutions are permitted if functionally equivalent and fully compatible with TAURON Dystrybucja S.A. requirements, subject to the required approvals. Mandatory minimum warranties run from the final acceptance protocol: modules 25 years, mounting system 10 years, mounting structure 15 years, inverters 10 years, and installation workmanship 3 years. Warranty service must be handled in Polish, with work started within 24 hours on working days and within 48 hours on statutory non-working days of fault notification. The maximum contract period is 6 months from signature, with the scope in Chapter II point 7 items a) to l) to be completed within 4 months.
Bidder eligibility
Mandatory bidder conditions are set out in inquiry no. 01C/REKO/PV/2026 dated 19.11.2026, which is not reproduced on this page. The notice states that bidders must meet the conditions jointly, and that failure to meet the basic requirements leads to rejection. Those basic requirements include: (1) the offer must match the scope in Chapter II and comply with the specification in Chapter III; (2) minimum warranty periods as listed above; (3) Polish-language warranty service with the stated response times; (4) compliance with the 6-month and 4-month delivery deadlines. Specific technical references, registrations, financial thresholds and prior-experience requirements are not stated on this page and must be checked in the full inquiry document.
How bids are scored
Not disclosed on the page. The notice lists basic requirements whose failure results in rejection, but does not state a scoring method, price/quality split or weightings. These must be checked in the full inquiry document.
Key requirements
- Supply and install 768 modules of 650 Wp (about 499.2 kWp) on ground-mounted structure
- Five inverters totalling 440 kW (3x80 kW, 2x100 kW) at 400 V, on-grid zero-export operation
- Install per included technical design and grid connection conditions, with equivalent components allowed
Relevant sectors
How this compares
How this compares
- Compared with 292 similar tenders (renewables in Poland) listed in the last 12 months.
- It allows 17 days to respond, shorter than the typical 22 days across 222 similar tenders.
- The same organisation listed 3 other similar tenders here in the last 12 months.
Closest open tenders
- Construction of PV Stare Brynki 9.03872 MW photovoltaic plant
- Solar PV roof installation with energy storage at Ministry of Finance building
- Green energy for Kraśnik: photovoltaic installations with energy storage supply
- 436.17 kW Solar Farm with Infrastructure for Mikołów Wastewater Plant
- Solar PV plant with energy storage at Sosnowiec bus depot
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)